User Tools

Site Tools


academic_database:projectphase1

This is an old revision of the document!


PHASE 1: INTERMEDIATE SUBMISSION CHECKLIST/SIGNOFF SHEET

GROUP #: 16 GROUP NAME:<font 9pt/arial;;#000000;;#FFD700>???</font>


Intermediate Deliverables:

􀀹 Requirements description
􀀹 ER diagram with min/max specifications

Intermediate Assessment:
􀀹 Group Status Report


We have each reviewed the contents of this deliverable.

                        Printed Name               Signature
Phase Leader            Valdrin Asllani         ___________________
Phase Recorder          Jeremy Booker           ___________________
Phase Checker           Jordan Born             ___________________
Technical Advisor 1     Bing Hao                ___________________
Technical Advisor 2     Pedro Perez             ___________________

<font 9pt/arial;;#000000;;#FFD700>(Above block needs further work)</font>


1. Introduction


2. Requirements and Description of the Enterprise


3. Conceptual Design ER Diagram


GROUP STATUS REPORT

academic_database/projectphase1.1378274794.txt.gz · Last modified: 2023/02/11 17:30 (external edit)

Except where otherwise noted, content on this wiki is licensed under the following license: CC Attribution-Noncommercial-Share Alike 4.0 International
CC Attribution-Noncommercial-Share Alike 4.0 International Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki