Table of Contents

PHASE 1: INTERMEDIATE SUBMISSION CHECKLIST/SIGNOFF SHEET

GROUP #: 16 GROUP NAME: FIXME


Intermediate Deliverables:

Intermediate Assessment:


We have each reviewed the contents of this deliverable.

                        Printed Name               Signature
Phase Leader            Valdrin Asllani         ___________________
Phase Recorder          Jeremy Booker           ___________________
Phase Checker           Jordan Born             ___________________
Technical Advisor 1     Bing Hao                ___________________
Technical Advisor 2     Pedro Perez             ___________________

(Above block needs further work)FIXME


1. Introduction


2. Requirements and Description of the Enterprise


3. Conceptual Design ER Diagram


GROUP STATUS REPORT