academic_database:projectphase1
Differences
This shows you the differences between two versions of the page.
Previous revision | |||
— | academic_database:projectphase1 [2023/02/11 17:30] (current) – external edit 127.0.0.1 | ||
---|---|---|---|
Line 1: | Line 1: | ||
+ | ===== PHASE 1: INTERMEDIATE SUBMISSION CHECKLIST/ | ||
+ | |||
+ | |||
+ | GROUP #: 16 GROUP NAME: FIXME | ||
+ | |||
+ | |||
+ | ---- | ||
+ | |||
+ | |||
+ | **Intermediate Deliverables: | ||
+ | |||
+ | |||
+ | * Requirements description | ||
+ | * ER diagram with min/max specifications | ||
+ | |||
+ | |||
+ | **Intermediate Assessment: | ||
+ | |||
+ | |||
+ | * Group Status Report | ||
+ | |||
+ | |||
+ | ---- | ||
+ | |||
+ | |||
+ | We have each reviewed the contents of this deliverable. | ||
+ | |||
+ | |||
+ | < | ||
+ | Printed Name | ||
+ | Phase Leader | ||
+ | Phase Recorder | ||
+ | Phase Checker | ||
+ | Technical Advisor 1 Bing Hao ___________________ | ||
+ | Technical Advisor 2 Pedro Perez | ||
+ | </ | ||
+ | |||
+ | |||
+ | (Above block needs further work)FIXME | ||
+ | |||
+ | |||
+ | ---- | ||
+ | |||
+ | ==== 1. Introduction ==== | ||
+ | |||
+ | |||
+ | ---- | ||
+ | |||
+ | |||
+ | ==== 2. Requirements and Description of the Enterprise ==== | ||
+ | |||
+ | |||
+ | ---- | ||
+ | |||
+ | |||
+ | ==== 3. Conceptual Design ER Diagram ==== | ||
+ | |||
+ | |||
+ | ---- | ||
+ | |||
+ | |||
+ | ==== GROUP STATUS REPORT ==== | ||