User Tools

Site Tools


academic_database:projectphase1

Differences

This shows you the differences between two versions of the page.


Previous revision
academic_database:projectphase1 [2023/02/11 17:30] (current) – external edit 127.0.0.1
Line 1: Line 1:
 +===== PHASE 1: INTERMEDIATE SUBMISSION CHECKLIST/SIGNOFF SHEET =====
 +
 +
 +GROUP #: 16 GROUP NAME: FIXME 
 +
 +
 +----
 +
 +
 +**Intermediate Deliverables:** 
 +
 +
 +    * Requirements description
 +    * ER diagram with min/max specifications
 +
 +
 +**Intermediate Assessment:** 
 +
 +
 +    * Group Status Report
 +
 +
 +----
 +
 +
 +We have each reviewed the contents of this deliverable.
 +
 +
 +<code>
 +                        Printed Name               Signature
 +Phase Leader            Valdrin Asllani         ___________________
 +Phase Recorder          Jeremy Booker           ___________________
 +Phase Checker           Jordan Born             ___________________
 +Technical Advisor 1     Bing Hao                ___________________
 +Technical Advisor 2     Pedro Perez             ___________________
 +</code>
 +
 +
 +(Above block needs further work)FIXME 
 +
 +
 +----
 +
 +==== 1. Introduction ====
 +
 +
 +----
 +
 +
 +==== 2. Requirements and Description of the Enterprise ====
 +
 +
 +----
 +
 +
 +==== 3. Conceptual Design ER Diagram ====
 +
 +
 +----
 +
 +
 +==== GROUP STATUS REPORT ====
  

Except where otherwise noted, content on this wiki is licensed under the following license: CC Attribution-Noncommercial-Share Alike 4.0 International
CC Attribution-Noncommercial-Share Alike 4.0 International Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki