academic_database:projectphase1
This is an old revision of the document!
Table of Contents
PHASE 1: INTERMEDIATE SUBMISSION CHECKLIST/SIGNOFF SHEET
GROUP #: 16 GROUP NAME:<font 9pt/arial;;#000000;;#FFD700>???<font 14px line-height: 19px;/Arial, sans-serif;;rgb(51, 51, 51) font-family: Arial, sans-serif; font-size: 14px; line-height: 19px;;;#ffffff> </font> </font>
Intermediate Deliverables:
- Requirements description
- ER diagram with min/max specifications
Intermediate Assessment:
- Group Status Report
We have each reviewed the contents of this deliverable.
Printed Name Signature Phase Leader Valdrin Asllani ___________________ Phase Recorder Jeremy Booker ___________________ Phase Checker Jordan Born ___________________ Technical Advisor 1 Bing Hao ___________________ Technical Advisor 2 Pedro Perez ___________________
<font 9pt/arial;;#000000;;#FFD700>(Above block needs further work <font 14px line-height: 19px;/Arial, sans-serif;;rgb(51, 51, 51) font-family: Arial, sans-serif; font-size: 14px; line-height: 19px;;;#ffffff></font> )</font><font 14px line-height: 19px;/Arial, sans-serif;;rgb(51, 51, 51) font-family: Arial, sans-serif; font-size: 14px; line-height: 19px;;;#ffffff></font>
1. Introduction
2. Requirements and Description of the Enterprise
3. Conceptual Design ER Diagram
GROUP STATUS REPORT
academic_database/projectphase1.1378276478.txt.gz · Last modified: 2023/02/11 17:30 (external edit)