This is an old revision of the document!
Table of Contents
PHASE 1: INTERMEDIATE SUBMISSION CHECKLIST/SIGNOFF SHEET
GROUP #: 16 GROUP NAME:<font 9pt/arial;;#000000;;#FFD700>???</font>
Intermediate Deliverables:
Requirements description
ER diagram with min/max specifications
Intermediate Assessment:
Group Status Report
We have each reviewed the contents of this deliverable.
//Printed Name Signature// \\
Phase Leader Valdrin Asllani _
Phase Recorder Jeremy Booker _
Phase Checker Jordan Born _
Technical Advisor 1 Bing Hao _
Technical Advisor 2 Pedro Perez _
<font 9pt/arial;;#000000;;#FFD700>(This Column needs</font>
<font 9pt/arial;;#000000;;#FFD700>further work)</font>
—-
Club Database
==== Table of Contents ====
1. Introduction ?
2. Requirements and Description of the Enterprise ?
3. Conceptual Design ER Diagram _ ?
GROUP STATUS REPORT __ ?